Skip to main content

Install Water Basin

1:40
26:04
23.5K views

At 1:40 in

You can mow 97 lawns or do 1 pond install in 4 hours....

What happens here

Once the hole is excavated, carefully place a large plastic black box (water basin) into the hole. This box will serve as the underground reservoir that holds the water for your feature. Ensure it is level and properly seated within the excavated space.

Goal: Properly install the water basin in the excavated hole.

Tools and materials

  • Large Plastic Black Box — Creating the underground reservoir for the water feature

What they say

Hide

20 in deep, you put a big plastic black box in it and then you stick a fountain on top of it. You can charge a customer $3,400 and he can do he does his crews do two every single day. Wow. Yeah. And so what you're going to see today, guys, is I'm going to take you to Aquacape. We're going to show you that he doesn't say that in this video. And I don't know why he doesn't say that in this video,

Auto-generated from the video audio.