Install Water Basin
1:40
26:04
23.5K views
At 1:40 in
You can mow 97 lawns or do 1 pond install in 4 hours....
What happens here
Once the hole is excavated, carefully place a large plastic black box (water basin) into the hole. This box will serve as the underground reservoir that holds the water for your feature. Ensure it is level and properly seated within the excavated space.
Goal: Properly install the water basin in the excavated hole.
Tools and materials
- Large Plastic Black Box — Creating the underground reservoir for the water feature
What they say
(397 characters)Hide
What they say
(397 characters)Auto-generated from the video audio.